Historic Building Renovations




Updated 3/16/22


The restoration project for our entire Historic Building began in early February 2022.


All Trades Historical Restoration LLC was selected to perform a thorough cleaning, followed by repairing all cracks and voids that are uncovered. After all preparations are made, they will then paint previously painted surfaces and coat the brick with a commercial water repellant. We are expecting this project to take about 6 months. All preservation methods will follow the National Parks Services Technical Preservation Guidelines.


Due to work on the church building, the portion of the alley behind the north end of the church was closed for the month of February (Monday thru Friday from 7:00am to 5:00pm). Work in that area has ended, and the alley has reopened.